The Construction of the PRO-KLIMA Photovoltaic Power Plant for Production Hall Purposes

Operational program: Competitiveness and Cohesion 2014-2020

On 11/23/2017, PRO-KLIMA d.o.o. began implementing the project for the construction of the PRO-KLIMA photovoltaic power plant for production hall purposes. The scope of the project plans for the construction of the PRO-KLIMA photovoltaic power plant for own energy consumption purposes, with a total power capacity of 350.0 kW, made up of 1,349 modules, each with a power capacity of 305.0 W. The construction of the photovoltaic power plant will decrease the consumption of electrical energy from conventional sources by supplying the energy required for production hall purposes from RES.

Project goals and expected outcomes

Our annual consumption of energy from conventional sources amounts to 534,770 kWh. The total energy production of the photovoltaic power plant will amount to 421,500 kWh. Energy saving will amount to 78.82% and the reduction in CO2 emission will amount to 98.97 t. The percentage of renewable energy in the total energy consumption of PRO-KLIMA d.o.o. will amount to 78.82%.

Total project value: 3,179,046.92 HRK

EU grant amount: 1,937,978.38 HRK

Implementation period: 11/23/2017 – 12/31/2020

For more information, feel free to contact us at proklima@proklima.hr or at 01-6546-343.

Additional information is available at the website www.strukturnifondovi.hr and at https://strukturnifondovi.hr/eu-fondovi/esi-fondovi-2014-2020/op-konkurentnost-i-kohezija/.

This project is co-funded by the European Union under the European Regional Development Fund.